FUNCTIONAL MATERIAL CONVERTING FOR ELECTRONICSSHENZHEN, CHINA · 15+ YEARS TEAM EXPERIENCE
HOME/CASE STUDY

Thermal silicone pad with assembly positioning features

A die-cut thermal silicone pad fills the designed gap and stays aligned through liner removal, placement and final compression.

THERMAL INTERFACE

Thermal silicone pad with assembly positioning features

A die-cut thermal silicone pad fills the designed gap and stays aligned through liner removal, placement and final compression.

APPLICATIONProcessors, heat sinks, fans and power modulesENGINEERING GOALCreate consistent contact through the tolerance range and keep the pad easy to place.DELIVERYProtected liner-based parts or sheets with side, orientation and lot clearly identified.
Thermal silicone pad with assembly positioning features
WANXIN PART EXAMPLE · ENGINEERING CASE REVIEW
01
CUSTOMER PROBLEM

What made the part difficult?

A pad that does not match the real gap can under-contact or over-compress. Soft material can stretch, pick up dust or shift when the liner is removed.

01Real gap and tolerance stack
02Compressed thickness and pressure
03Heat-source and heat-sink contact area
04Manual or automated placement
02 / ENGINEERING ROUTE

From requirement to a manufacturable construction.

01

Candidate material stack

Thermally conductive silicone sheet

Optional single-side tack or carrier

Protective liners matched to the assembly sequence

02

DFM review

Size the pad to the active contact area

Add peel tabs or split liners without reducing contact

Review fragile bridges, holes and minimum edge width

03

Converting process

Material conditioning and lamination

Laser prototype or precision die cutting

Protected packing to control dust and deformation

03 / VERIFICATION PLAN

Define acceptance before production.

01

Material grade and nominal thickness

02

Outline, holes and positioning features

03

Peel behavior and placement trial

04

Customer thermal and compression validation

04 / PROJECT RESULT

What the project handed to the next team.

The result fixes the approved construction, verification checkpoints and delivery standard needed for repeat production.

01

Pad outline and positioning features confirmed through fit review

02

Liner sequence and pickup method defined for stable placement

03

Thickness, outline and surface inspection points fixed for production

Back to all casesRelated solution
FREE SAMPLE · FAST RESPONSE

Tell us your requirement. Move the project forward.

Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.

01Quotation response within 1 hour+

After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.

02Workshop / engineering response within 4 hours+

Drawing, material, process, tolerance and delivery questions are passed to the responsible workshop or engineer for a practical answer.

03Project follow-up starts within 1 working day+

Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.

04Free samples in 1–3 days+

Samples are free. For feasible standard projects, samples can be prepared in 1–3 days after drawing and material confirmation.

05Visible production progress+

Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.

FREE SAMPLE · ONE-HOUR QUOTATION RESPONSE

Start with the problem. Add a drawing when available.

Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional; every project can request samples.

Start a quick RFQ