FUNCTIONAL MATERIAL CONVERTING FOR ELECTRONICSSHENZHEN, CHINA · 15+ YEARS TEAM EXPERIENCE
HOME/CASE STUDY

Thin-profile insulation part with windows and positioning features

A precision-cut film separates conductive areas inside a compact stack while preserving access to connectors, screws and heat paths.

INSULATION

Thin-profile insulation part with windows and positioning features

A precision-cut film separates conductive areas inside a compact stack while preserving access to connectors, screws and heat paths.

APPLICATIONStorage / power and control electronicsENGINEERING GOALMaintain electrical separation without consuming unnecessary assembly space.DELIVERYParts are oriented and protected to prevent curling, scratching or mix-up at the assembly station.
Thin-profile insulation part with windows and positioning features
WANXIN PART EXAMPLE · ENGINEERING CASE REVIEW
01
CUSTOMER PROBLEM

What made the part difficult?

The part must cover the risk area without interfering with nearby components, and thin edges must stay flat through handling and assembly.

01Voltage and dielectric target
02Tight edge clearance
03Multiple windows and holes
04Flatness during assembly
02 / ENGINEERING ROUTE

From requirement to a manufacturable construction.

01

Candidate material stack

PET, PI or PC film selected by requirement

Optional adhesive or non-adhesive construction

Protective / release liner as needed

02

DFM review

Check window-to-edge distance

Use radii at stress-sensitive corners

Add datum holes or removable handling tabs

03

Converting process

Laser sample for fit review

Flatbed or roll-fed die cutting

Controlled waste removal and packing

03 / VERIFICATION PLAN

Define acceptance before production.

01

Film grade and thickness

02

Outline, hole and window dimensions

03

Surface condition and burr / edge review

04

Dielectric and assembly validation to customer specification

04 / PROJECT RESULT

What the project handed to the next team.

The result fixes the approved construction, verification checkpoints and delivery standard needed for repeat production.

01

Window, hole and edge coverage confirmed through sample fit review

02

Protected presentation defined to reduce curling, scratches and part mix-up

03

Dielectric and assembly acceptance retained as customer-controlled validation items

Back to all casesRelated solution
FREE SAMPLE · FAST RESPONSE

Tell us your requirement. Move the project forward.

Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.

01Quotation response within 1 hour+

After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.

02Workshop / engineering response within 4 hours+

Drawing, material, process, tolerance and delivery questions are passed to the responsible workshop or engineer for a practical answer.

03Project follow-up starts within 1 working day+

Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.

04Free samples in 1–3 days+

Samples are free. For feasible standard projects, samples can be prepared in 1–3 days after drawing and material confirmation.

05Visible production progress+

Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.

FREE SAMPLE · ONE-HOUR QUOTATION RESPONSE

Start with the problem. Add a drawing when available.

Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional; every project can request samples.

Start a quick RFQ