Candidate materials
Double-sided tape
VHB acrylic foam tape
Stretch-release pull tape
High-temperature tape
WANXIN PRECISIONSHENZHEN WANXIN PRECISION CUT CO., LTD.Consider surfaces, loads, temperature and assembly method together.
Consider surfaces, loads, temperature and assembly method together.
Choose the symptom closest to your project below. We then connect it to a cause, a manufacturable route and a verification method.

Open each route to see how the problem becomes a manufacturable, verifiable part.
Surface energy, contamination, load, temperature or dwell time does not match the adhesive.
Compare adhesive systems and convert the selected tape with stress-relief geometry.
Peel / holding trial, surface preparation and environmental validation.
The part lacks a usable tab, datum or stable carrier.
Design easy-peel liners, positioning features and roll or sheet presentation.
Assembly trial, liner sequence and critical position check.
Pull direction, bonded length, handle geometry, substrate or storage condition does not match the removal motion.
Review the removal path and convert stretch-release tape with a protected handle, clear pull direction and controlled bonded area.
Bonding trial, pull-direction test, removal speed and residue check on the actual substrates.
Double-sided tape
VHB acrylic foam tape
Stretch-release pull tape
High-temperature tape
Lamination and liner conversion
Kiss-cut and easy-peel tabs
Assembly-ready part presentation
Surface energy and cleanliness
Static / dynamic load
Temperature, humidity and dwell time
Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.
After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.
Drawing, material, process, tolerance and delivery questions are passed to the responsible workshop or engineer for a practical answer.
Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.
Samples are free. For feasible standard projects, samples can be prepared in 1–3 days after drawing and material confirmation.
Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.
Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional; every project can request samples.